← Back to the HFA glass-fiber page

Replacement Fit Checklist

Mark each field only after it has been compared with the installed cartridge or housing. Matching all fields means the input comparison is complete, not that performance equivalence has been certified.

Complete the checklist to begin.

Send a drawing or sample for case-by-case verification.