Compare two changeout plans

We can help you compare annual bag and labour costs using your own figures. Enter both plans in the same currency. We do not supply assumed prices or replacement intervals.

Complete all ten fields. Use whole numbers for bags and annual changeouts; other fields allow decimals. Each input accepts 0 to 1,000,000. Very large totals are rejected. These are numeric limits, not operating recommendations.
Plan A
Plan B

Your annual comparison

Enter both plans to calculate.

What we include

Annual bag cost = price per bag × bags per changeout × changeouts per year.
Annual labour cost = labour hours per changeout × hourly rate × changeouts per year.
Annual direct cost = bag cost + labour cost. Difference = Plan B – Plan A.

Labour hours are total person-hours: two people working for one hour equal two labour hours. Displayed amounts are rounded to two decimals. The comparison excludes downtime, waste disposal, freight, tax, energy and other costs. It does not establish equal filtration performance, predict bag life or guarantee savings. Confirm each plan’s technical suitability separately.